
Our team has shipped AAC blocks, ALC panels and insulation blocks out of Chinese factories to builders, distributors and developers in Australia and New Zealand for more than ten years. Factory QC, container loading and the export paperwork stay in our hands — one contact, and a price close to what you would negotiate at the mill.

Ningbo Hengshuo Supply Chain Management Co., Ltd. trades lightweight masonry out of Zhejiang. The team has worked in AAC, ALC and composite block export for more than ten years; the company itself was registered in Ningbo in August 2026. We buy from block and panel plants in Zhejiang and Shandong, not from listing platforms.
We visit the plants, check the batch before the doors close, photograph every seal and issue the export documents ourselves. That keeps the quote close to a mill price, and keeps one person answerable when a container arrives short.
Quotes, drawings and inspection reports are handled in English, and we work to AS/NZS references rather than a GB number alone — that is what a certifier will ask for. One container or a year's programme, the steps are the same.
Five product lines for walls, floors, roofs and thermal insulation, made in Zhejiang and Shandong and shipped from Ningbo.

Autoclaved aerated concrete blocks. Lightweight, fire-resistant, thermally efficient. Suitable for internal and external walls.
Learn more →
Reinforced autoclaved lightweight concrete panels for walls, floors and roofs. Fast installation, factory-finished edges.
Learn more →
Expanded clay aggregate concrete blocks. Load-bearing, good thermal insulation, sound absorption.
Learn more →
Pre-insulated blocks with EPS or PUR core between concrete shells. High thermal performance in one block.
Learn more →
Interlocking ceramsite composite insulation blocks. Quick installation, built-in insulation, suitable for commercial buildings.
Learn more →Need other products? We can help you find and audit factories, and negotiate the lowest price as a Chinese buyer — often well below what you could get yourself. We charge a service fee.
Tell Us Your Needs →Same structural wall, insulation built in.
| Property | AAC Block | Cavity Wall (Brick + Insulation) | Composite Self-insulating Block |
|---|---|---|---|
| Thermal insulation | Average | Poor — needs extra insulation | Meets 75%+ energy-saving standard in one leaf |
| Waterproofing | Pores partly connected, fair | Brick itself not waterproof | Independent cement-layer pores; waterproof |
| Construction time | Needs separate insulation layer | Long — two trades on site | No separate insulation work, short schedule |
| Long-term maintenance | Insulation life ≤20 yrs, high cost | High maintenance cost | Same life as the building, no external layer to peel |
| Wall system | Structure + insulation + render | Structure + cavity + insulation + render | One block = structure + insulation |
We visit the plant before it goes on the quote: autoclave count, mould tolerance, and the last three batches of test reports.
A block or panel is couriered before the first container, so your certifier measures the product instead of reading a datasheet.
Dimensions, density, strength, packaging and container condition checked before the doors close. The photo report goes out the same day.
One 40HQ takes 55–65 m³ of block or 55–65 m² of 150 mm panel. We plan the stack so the last row is not scrap.
Invoice, packing list, certificate of origin, test reports and bill of lading prepared in house and passed to your broker.
The person who quotes the job also chases the factory and signs off the loading photos. No handover mid-order.

From Docklands apartments to Mornington retail, ALC panels are replacing block-and-render on fast-track commercial shells.

BCA, AS/NZS standards and what documents you need before ordering.

Density, strength, nail-holding and moisture — how the two lightweight blocks compare.

Queensland housing moves fast and floods come back. Why Brisbane builders are specifying AAC and ALC for speed, thermal mass and a wall that dries out.

From first inquiry to container on site — what actually happens at each step.

Weight, thermal performance, speed of installation and cost — a practical comparison.
A 20ft container is our MOQ for most products. For samples or trial orders, we can arrange LCL (less-than-container load), though the per-cubic-metre cost is higher.
From Ningbo or Shanghai: Sydney and Melbourne 14-18 days; Brisbane and Adelaide 18-22 days; Fremantle 20-24 days. Add 5-7 days for Australian customs clearance.
Yes. Every shipment includes a CNAS-accredited test report covering strength, density, thermal conductivity, fire resistance, frost resistance and dimensional tolerances. We also provide material data sheets and sample panels for CodeMark assessment.
Standard terms are 30% T/T deposit with order, 70% balance after you confirm loading photos and video. For repeat customers, we can discuss other arrangements.
Yes. We work with multiple Chinese factories across lightweight masonry, insulation and building systems. If your project needs something outside our standard range, tell us the specifications and we will source it for you.
Tell us your product, quantity and destination port. We will send you a detailed quotation within 24 hours.
Request a Quote